Mechanical works:
- Off-loading, distribution, ramming, assembling and testing of the mounting structure
- Ramming of the piles
- PV and Inverter Structure Mounting
- PV Module Installation
Mechanical works:
Mechanical works:
Mechanical works:
Mechanical works:
Ramming of the piles
Structure Mounting System
Mounting of the PV panels
Electrical works:
Laying of the DC, AC (LV, MV) data cables
Inverter installation
MV stations installation and cabling
Installation of Earthing systems, Weather station, CCTV and SCADA systems
50MW solar project in Spain
Mechanical and Electrical installation of a PV Modules:
697kWp + 750kWp solar project in Germany
Work done:
AC Installation
The solar farm, erected by Viking Renewable BG, is situated on land near Fishbeck, Germany.
Works done by Viking Renewable BG as CONTRACTOR:
AC Installation
This 50 MW solar park, erected by Viking Renewable UK Ltd, is situated on a disused airfield near Fakenham in Norfolk is one of the largest in the UK, generating enough renewable electricity to power more than 11,000 average homes
Works are done by Viking Renewable UK Ltd. as CONTRACTOR:
Site management
Security 24 h
Temporary storage area
Reception and Unloading of the materials
Civil works:
Ground cleaning and preparation of the working area
Road Paths
Internal and Access Road
Execution of buildings foundation
Execution of Customer Switching Room, Control and CCTV Building and Meteorological Station Foundations
Trenches and conduits (supply and installation)
Fencing (supply and installation)
Demolitions
Mechanical works:
Topographical works
Ramming of the piles
Structure Mounting System
Mounting of the PV panels
Electrical works:
Installation of AC cabling between inverters and transformers
Installation of DC cabling between inverters and string combiner boxes
Installation of DC cabling between string combiner boxes and panels
Connection PV modules
Assembly of string combiner boxes
Connection and installation of the inverters, MV transformers
Grounding connection
Installation of auxiliary supply between the distribution board and inverter.
Fitting of fuses (left forward) in each string combiner box.
Installation of data cabling between the logger, inverters, and string combiner boxes.
Installation of 1 off-earth rod and earth lead to each string combiner box.
Connection of each substation earth mat linking the inverters and transformers together.
Carry out final glanding / termination of all installed cabling.
Testing and commissioning
As-built documents
The solar farm , erected by Viking Renewable UK Ltd, is situated on land at Primrose Hill Farm in Lincolnshire. The solar farm will provide the local electricity needs of almost 1,100 average UK households and will save in the region of 2700 tons of carbon dioxide per year.
Works done by Viking Renewable UK Ltd. as CONTRACTOR:
The solar farm, constructed by Viking Renewable UK Ltd, is located to Baker’s Farm. It has the capacity to generate up to 12 MW of clean energy, enough to power around 3,686 average UK households. It would save around 7200 tons of CO2 emissions per year.
Works done by Viking Renewable UK Ltd. as CONTRACTOR:
Civil works
Topographical works
Temporary storage area
Delivery of materials, supplies
Access road
Inverter foundations
Trenches and conduits
Road paths
Cleaning
Electrical works
Installation of DC cabling between inverters and string combiner boxes
Installation of DC cabling between string combiner boxes and panels
Installation of AC cabling between inverters and transformers
Inverters connections
Testing and commissioning
As-built layouts
Delivery system